Case studies
Three implementations in the sector
Case study I
A global leader in power and automation technologies
One access management system in place of two, with documentation for SOX controls.
Case study IIA global manufacturer of electrical and electronic equipment
A platform meeting audit, process and control requirements.
Case study IIIA Polish power construction company
IGA processes built from scratch and the platform implemented.
Starting point
The problems we started with
Most frequently reported
- No processes for granting access
- No way to audit active access
- No unified system for global and local applications
- Insufficient records for SOX controls
- Scattered responsibility for access
Results
What the power construction company gained
Clear processes
Established access management rules.
Auditability
The ability to audit existing access.
Transparency
Greater control over access to digital resources.
IT department time
Process automation takes load off the team.
Expansion
The platform can be extended to further applications.
Regulations
The energy sector is covered by NIS2 requirements — order in access is one of their elements.
See sara.next on your own scenarios
During the presentation we will walk through an access request, approval, automatic execution of the change and a review — using examples from your organisation.